Click here to go to the first RED TEAM post in this thread.   Thread: changing meta frame rate

Reply to Thread
Results 1 to 5 of 5
  1. #1 changing meta frame rate 
    I had some footage shot a while back on RED at 29.97 - but the metadata was 23.98. When I try to edit it in FCP, it will not let me change the footage to 29.97. I'm just trying to figure out a way to change the metadata without re-rending the whole clip. There are a lot of clips and while redcine can do this in batch mode (thank you!) - it would take longer than would be ideal. Any tips are appreciated.
    Mark Allen - director
    www.markallen.net
    RED EPIC #89
    Reply With Quote  
     

  2.   Click here to go to the next RED TEAM post in this thread.
  #2  
    I'm confused how you go to this point. You say you recorded at 29.97 and the clip ended up at 23.98? I've never ever seen that happen.... please explain exactly what is happening. We'll take it from there.
    ROBCODE Santa Claus @ RED

    "You get the chicken by waiting for the egg to hatch, not by smashing it with a hammer" - Jarred
    Reply With Quote  
     

  3.   This is the last RED TEAM post in this thread.   #3 27.97, 27.98 
    Red Team Stuart English's Avatar
    Join Date
    Dec 2006
    Location
    Irvine, Ca
    Posts
    3,642
    Yeah 27.98 is just shorthand for 27.976.....
    Workflow Wizard
    Reply With Quote  
     

  4. #4  
    Senior Member Nick Shaw's Avatar
    Join Date
    Dec 2006
    Location
    London, UK
    Posts
    1,391
    I'm guessing that you shot at 29.97 2k with a project setting of 23.98 fps, so the footage is being treated as if it was 25% overcranked for a 23.98 fps edit, rather than normal speed for a 29.97 fps edit. It that right?

    Is it possible to use Cinema Tools to conform Red proxies to a different framerate? Might mess up the timecode though.
    Reply With Quote  
     

  5. #5  
    Senior Member I Bloom's Avatar
    Join Date
    Jan 2007
    Location
    Manhattan
    Posts
    2,199
    Quote Originally Posted by Mark Allen View Post
    I had some footage shot a while back on RED at 29.97 - but the metadata was 23.98. When I try to edit it in FCP, it will not let me change the footage to 29.97. I'm just trying to figure out a way to change the metadata without re-rending the whole clip. There are a lot of clips and while redcine can do this in batch mode (thank you!) - it would take longer than would be ideal. Any tips are appreciated.
    This must be 2K windowed, aye?

    IBloom
    Reply With Quote  
     

Posting Permissions
  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts